Located only a few miles from the Meadowlands Sports and Entertainment Complex with stunning views of the New York City skyline right across the river, the Hilton Hasbrouck Heights Hotel enjoys a remarkably high rate of occupancy as well as a constant flow of meeting and banquet bookings. Proper phasing of guestrooms, meeting spaces, and the restaurant was critical to this project.

CONTACT US

PROJECT DESCRIPTION

  • Category: Hospitality
  • Location: Hasbrouck, NJ
  • Owner/Client: The Blackstone Group
  • Architect: Looney & Associates
  • Contract Value: $5.5 Million
  • Duration: 4 Months

PROJECT DETAILS

  • Renovated 340 guestrooms and suites
  • Replaced in-wall PTAC units and added remote wall-mounted controls
  • Upgraded lighting including a new Lutron dimming system
  • Installed carpet, pad, vinyl wallcovering, and paint
  • Bathrooms received new tile, granite countertops, and undermount lavatory basins
  • Multiple guestrooms were converted to ADA-accessible rooms
  • Corridors and elevator lobbies received all new floor, wall, and ceiling finishes
  • Existing elevator cabs were refinished with millwork

PROJECT DESCRIPTION

  • Category: Hospitality
  • Location: Hasbrouck, NJ
  • Owner/Client: The Blackstone Group
  • Architect: Looney & Associates
  • Contract Value: $1.5 Million
  • Duration: 2 Months

PROJECT DETAILS

  • Renovated ballroom, meeting room, and pre-function area
  • A portion of the existing restaurant was converted into two additional meeting rooms
  • Installed new stained doors and hardware, featuring architectural glass
  • Millwork panel wraps around columns were implemented
  • Suspended ceiling systems were replaced with new acoustical ceiling tile
  • Architectural lighting enhancements
  • New vinyl wallcovering, paint, and carpet

PROJECT DESCRIPTION

  • Category: Hospitality
  • Location: Hasbrouck, NJ
  • Owner/Client: The Blackstone Group
  • Architect: Looney & Associates
  • Contract Value: $5.5 Million
  • Duration: 4 Months

PROJECT DETAILS

  • Rough-in work for an enhanced mechanical distribution system
  • One-story service stairway added with multiple structural modifications
  • Millwork bar and back bar installed with illuminating features
  • Installed new dimming system with decorative pendant, recessed, and sconce lighting
  • New flooring featured stone, wood, and carpet
  • Millwork package installed column panel wrapping, new reception desk, and floor-to-ceiling elevator trim-outs
  • Glass panels with stainless steel railings
  • Decorative lattice panels
NEWH DC Chapter,
Gold Maven Sponsor
AGC of America
Allied Member SM Seal
International Hospitality Institute