The Mandarin Oriental is a luxury hotel in downtown Washington, DC with views of the Washington Monument and the marina. HR Construction Group completed a 6 month renovation of 323 guestrooms and 46 suites. Some of the renovation included demolition, liquidation, millwork installation, painting, and wall covering.
Mandarin Oriental Washington, DC
PROJECT DESCRIPTION
- Category: Hospitality
- Location: Washington, DC
- Owner/Client: Mandarin Oriental
- Architect: BBGM
- Contract Value: $7.94 Million
- Duration: 6 Months
PROJECT DETAILS
- Renovation of 323 guestrooms and 46 suites
- Demolished pre-existing hotel guestrooms
- Performed FF&E warehousing, delivery and installation of furniture
- Installed F&I crown molding and a stain grade millwork closet system
- Constructed new metal framing, drywall and drywall finishing
- Painted and installed wall covering
- Installed new carpet and floor tile
- Relocated sprinkler head
- F&I down lights, lighted closet rods and relocated electrical outlets
- Established new fiber to each guestroom, paired with new Inncom technology
- Created two new ADA and 19 hearing impaired rooms