HR Construction completed a full-scale renovation of the historic St. James building in the Gaslamp district of downtown San Diego to include (122) guestrooms and corridors, lobby, meeting space, restaurant/bar, basement, elevator cabs, and a rooftop. The scope of the project included replacement of all original waste/vent piping stacks, fire alarm system upgrade, new TPO roof, exterior painting, historic window replacement, installation of in-room AC units along with new millwork, paint, flooring, plumbing, lighting, and tile finished throughout. Truly a transformation of one of the most iconic buildings in San Diego.
Palihotel San Diego
PROJECT DESCRIPTION
- Category: Hospitality
- Scope: Guestroom + Public Spaces
- Location: San Diego, CA
- Owner/Client: Dovetail + Co.
- Contract Value: $9.2 Million
- Project Duration: 11 Months
- Year Completed: 2023
PROJECT DETAILS
- Full-scale renovation of the historic St. James building
- Built 122 guestrooms and corridors, lobby, meeting space, restaurant/bar, basement, elevator cabs, and rooftop
- Replaced original waste/vent piping stacks
- Upgraded fire alarm system
- Added new TPO roof
- Painted the exterior
- Replaced historic windows
- Install in-room AC units with new millwork, paint, flooring, plumbing, lighting, and tile finishes