(301) 330-1650

Saratoga Hilton

While the majority of HR Construction Group‘s projects are located in and around Washington, DC and Baltimore, MD our work is not confined to these metropolitan areas alone.  A perfect example of our ability to effectively and efficiently manage the full-scale renovation of an entire resort property from top to bottom is the Saratoga Hilton.

CONTACT US

PROJECT DESCRIPTION

  • Category: Hospitality
  • Location: Saratoga Springs, NY
  • Owner/Client: Blackstone Group
  • Architect: Looney & Associates
  • Contract Value: $4 Million
  • Duration: 6 Months

PROJECT DETAILS

  • Renovation of 212 guestrooms, suites, corridors, and elevator lobbies
  • Bathrooms received: new tile throughout, vanity bases, granite countertops, and new brightwork
  • Guestrooms received new drywall ceilings, carpet, wall covering, and paint finishes
  • PTAC units were replaced with new wall-mounted remote controls and millwork surrounds
  • Guestrooms and bathrooms received upgraded lightning and a new Lutron dimming system
  • New wall, ceiling, and floor finishes were applied to each corridor
  • Elevator cab interior work included re-finishing the existing metal surfaces and installing new millwork ceiling and wall panels
  • 30 Suites received new finishes along with reconfigured bathrooms

PROJECT DESCRIPTION

  • Category: Hospitality
  • Location: Saratoga Spring, NY
  • Owner/Client: The Blackstone Group
  • Architect: Looney & Associates
  • Contract Value: $2 Million
  • Duration: 4 Months

PROJECT DETAILS

  • Conversion of existing restaurant to 4-Star “Chez Sophie”
  • Gutted the existing restaurant including the existing mechanical, electrical, and plumbing systems
  • New kitchen, including equipment and suspended exhaust hood system
  • Added two separate adjoining meeting rooms and a private dining area
  • Roof-mounted split-system air handling units were installed with interior controls and duct distribution
  • Public restrooms were reconfigured and updated with new floor tile and wall covering
  • Installed new millwork vanities with granite tops, brightwork, and millwork toilet partitions
  • Installed fine-woven carpet and dark wood flooring in the restaurant
  • Two-sided fireplace added to establish ambiance

PROJECT DESCRIPTION

  • Category: Hospitality
  • Location: Saratoga Springs, NY
  • Owner/Client: The Blackstone Group
  • Architect: Dyami Architecture, PC
  • Contract Value: $3.3 Million
  • Duration: 5 Months

PROJECT DETAILS

  • Renovated 22,000 square-feet of interior public space
  • Installed new acoustical ceiling tile systems, carpet, wall coverings, and paint
  • Ceiling space was maximized thru clever design, which resulted in a series of alternating ceiling heights
  • Lighting and dimming systems were replaced with recessed lighting, chandeliers, pendants, and lay-in fixtures
  • New millwork reception desk was fabricated and installed, along with a feature wall in the Lobby
  • Millwork package included column covers, new stained wood doors, two additional feature walls, and a stained wood base throughout
  • Reception and pre-function areas received approximately 8,000 square feet of marble tile
NEWH DC Chapter,
Gold Maven Sponsor
AGC of America
Allied Member SM Seal
International Hospitality Institute