The Carlyle – Kitchen Remodel

The Carlyle is a timeless, luxury hotel that lies within the heart of the Upper East Side. This legendary hotel contains 190 rooms and suites in which guests can oversee stunning views of Central Park and New York. The property maintains an impressive list of guests including every American President since Truman.

To date, HR Construction Group has finished a full remodel of the property’s kitchen. Renovations are continuing on the guestrooms, suites and corridors. This ultra high-end, detailed-oriented job is the first major renovation that the property has seen since the 1980s.

CONTACT US

PROJECT DESCRIPTION

  • Category: Hospitality
  • Location: New York City 
  • Owner: Rosewood Hotels & Resorts
  • Architect: Stonehill Taylor 
  • Contract Value: $1.6 Million 
  • Duration: 16 weeks

PROJECT DETAILS

  • Complete renovation of the existing hotel kitchen to include:
    • Demolition of all existing finishes and slab on grade
    • New floor tile, wall tile, paint and FRP
    • All new lighting, ceiling work, electrical and sprinkler system
    • Coordination of new ansul system
    • New grease duct & other HVAC work
    • All new plumbing (sewer, vent and water) and gas service
    • Re-installation of existing kitchen equipment & shelves
    • Coordination of all new kitchen equipment & walk in box installation
2018
The Carlyle A Rosewood Hotel kitchen demolition of existing fixtures
Demolition of existing fixtures
Demolition of slab on grade for The Carlyle kitchen
Demolition of slab on grade
The Carlyle kitchen trenched out for new plumbing
The kitchen is trenched out for all new plumbing to be installed
Rebar is installed to prepare for concrete in The Carlyle kitchen
Rebar is installed to prepare for concrete
Gravel laid for The Carlyle kitchen construction project
Gravel is laid
New concrete slab installed in The Carlyle kitchen
New concrete slab is installed
Electrical rough in and framing for The Carlyle kitchen
Electrical rough in and framing
FRP on back wall and new floor tile for The Carlyle kitchen
FRP on back wall and new floor tile